docs: implementation plan for the inter-app communication system

Eleven TDD tasks covering phase 1: contract and immutable procedure builder,
error classification, the signed subject-context token, the Transport seam
with an in-process transport for tests, implement() with fail-closed identity
and permission checks, the typed client proxy, the HTTP transport, router
discovery of app/services, and the mounted endpoint with its two independent
external-access guards.

Phases 2-4 (retry and circuit breaking, app-to-app streaming, identity for
pubsub and queue) are documented as deferred with the reason each needs its
own design pass.

Task 10 is called out as the highest-risk: if /__wrnexus/rpc/* is reachable
from the public internet, every permission check in the workspace is
bypassable, so the plan requires the gateway block and the app-side check to
be verified as working independently of each other.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>