docs: record verified private publication and showcase deployment readiness
This commit is contained in:
1 parent
3943b946d6
commit
f1cf0e9f2b
4 files changed
+321
-1
No files matched your search
@@ -2,7 +2,7 @@
|
||||
|
||||
Date: 2026-10-19. Status: architecture plan; phases 0–7 delivered within the scopes documented below. The user requested phase-by-phase delivery.
|
||||
|
||||
Implementation progress: [Phase 0 audit](2026-10-19-design-system-phase-0-audit.md), [Phase 1 engine](2026-10-19-design-system-phase-1-implementation.md), and [Phase 2 core contracts, recipes and three presets](2026-10-19-design-system-phase-2-implementation.md). [Phase 3 complete catalog rollout](2026-10-19-design-system-phase-3-implementation.md) is delivered. [Phase 4 local Design Studio](2026-10-19-design-system-phase-4-implementation.md) is delivered. [Phase 5 guided generation, alternatives and decision locks](2026-10-19-design-system-phase-5-implementation.md) is delivered. [Phase 6 MCP operations, agent context and conformance](2026-10-19-design-system-phase-6-implementation.md) is delivered. [Phase 7 shared packages, upgrades and release preparation](2026-10-19-design-system-phase-7-implementation.md) is delivered as a locally verified packaging candidate; the subsequent [release blocker clearance](2026-10-19-release-blocker-clearance.md) records passing repository production and installed-consumer gates. Publication remains held at the user’s request; registry/version verification belongs to the separately authorized publication workflow.
|
||||
Implementation progress: [Phase 0 audit](2026-10-19-design-system-phase-0-audit.md), [Phase 1 engine](2026-10-19-design-system-phase-1-implementation.md), and [Phase 2 core contracts, recipes and three presets](2026-10-19-design-system-phase-2-implementation.md). [Phase 3 complete catalog rollout](2026-10-19-design-system-phase-3-implementation.md) is delivered. [Phase 4 local Design Studio](2026-10-19-design-system-phase-4-implementation.md) is delivered. [Phase 5 guided generation, alternatives and decision locks](2026-10-19-design-system-phase-5-implementation.md) is delivered. [Phase 6 MCP operations, agent context and conformance](2026-10-19-design-system-phase-6-implementation.md) is delivered. [Phase 7 shared packages, upgrades and release preparation](2026-10-19-design-system-phase-7-implementation.md) is delivered as a locally verified packaging candidate; the subsequent [release blocker clearance](2026-10-19-release-blocker-clearance.md) records passing repository production and installed-consumer gates. The subsequent user-authorized [private release](../releases/2026-10-19-private-release.md) published and integrity-verified all 58 packages. The standalone component site is prepared for VM deployment; Git pushes are deferred until authentication is restored.
|
||||
|
||||
## Product outcome
|
||||
|
||||
|
||||
Reference in new issue
Block a user