6 Commits
Author SHA1 Message Date
platform-mcp 58c0cb5165 agent: Apply about page CRO improvements 2026-06-17 14:18:59 +05:30
platform-mcp 5e81c4bab5 agent: Apply homepage CRO improvements 2026-06-17 14:05:47 +05:30
platform-mcp 210117e73e feat(homepage): add TrustStrip + GuaranteeBand for trust + risk-reversal
Deploy to Production / Build & Verify (push) Has been cancelled
Deploy to Production / Pre-Deploy Tests (push) Has been cancelled
Deploy to Production / Deploy to Railway (push) Has been cancelled
Deploy to Production / Deploy to Render (push) Has been cancelled
Deploy to Production / Deploy to VPS (PM2) (push) Has been cancelled
Deploy to Production / Deploy to Fly.io (push) Has been cancelled
Deploy to Production / Post-Deploy Verification (push) Has been cancelled
Deploy to Production / Notify on Failure (push) Has been cancelled
E2E Test Suite / Smoke Tests (P0) (push) Has been cancelled
E2E Test Suite / Critical User Journeys (push) Has been cancelled
E2E Test Suite / API Integration Tests (push) Has been cancelled
E2E Test Suite / Form Interaction Tests (push) Has been cancelled
E2E Test Suite / Destructive & Chaos Tests (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (chromium) (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (firefox) (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (webkit) (push) Has been cancelled
E2E Test Suite / Mobile Device Tests (push) Has been cancelled
E2E Test Suite / Security Header Tests (push) Has been cancelled
E2E Test Suite / Test Report Summary (push) Has been cancelled
Ping Search Engines / Notify Search Engines (push) Failing after 13m20s
- TrustStrip.astro: single-row, grayscale-on-default / colour-on-hover
  client logo strip under the hero. 6 logos via <img> with explicit
  width/height + loading=lazy (CLS-safe), wraps to 3+3 on mobile.
  Includes sr-only "Trusted by" heading and dark-mode invert filter
  vetted against THEME_ACCESSIBILITY_AUDIT.md. Replaces the older
  ClientLogos placement on the homepage.

- GuaranteeBand.astro: 3-up risk-reversal band wedged between
  PricingTimelineBand and InlineLeadForm. Three claims (30-day
  satisfaction guarantee, no long-term contracts, fixed-price quotes)
  with icon + headline + supporting body. Stacks vertically on mobile.

- public/images/logos/: 6 placeholder SVG wordmarks (plnr, rentec,
  iit-patna, moc-soft, gov-bihar, pscl). Replace at same path with
  real client-supplied artwork when handed off.

- index.astro: wires the two new components, repoints the hero
  scroll indicator to #trust-strip, preserves legacy #client-logos
  anchor for any external deep-links.
2026-06-17 13:35:26 +05:30
platform-mcp e418650757 feat(homepage): add testimonial photos + outcome metric badges
Deploy to Production / Build & Verify (push) Has been cancelled
Deploy to Production / Pre-Deploy Tests (push) Has been cancelled
Deploy to Production / Deploy to Railway (push) Has been cancelled
Deploy to Production / Deploy to Render (push) Has been cancelled
Deploy to Production / Deploy to VPS (PM2) (push) Has been cancelled
Deploy to Production / Deploy to Fly.io (push) Has been cancelled
Deploy to Production / Post-Deploy Verification (push) Has been cancelled
Deploy to Production / Notify on Failure (push) Has been cancelled
E2E Test Suite / Critical User Journeys (push) Has been cancelled
E2E Test Suite / API Integration Tests (push) Has been cancelled
E2E Test Suite / Form Interaction Tests (push) Has been cancelled
E2E Test Suite / Destructive & Chaos Tests (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (chromium) (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (firefox) (push) Has been cancelled
E2E Test Suite / Cross-Browser Regression (webkit) (push) Has been cancelled
E2E Test Suite / Mobile Device Tests (push) Has been cancelled
E2E Test Suite / Security Header Tests (push) Has been cancelled
E2E Test Suite / Test Report Summary (push) Has been cancelled
E2E Test Suite / Smoke Tests (P0) (push) Has been cancelled
Ping Search Engines / Notify Search Engines (push) Failing after 11m13s
- Add `image`/`imageAlt`/`initials`/`metric`/`metricLabel` fields to the
  homepage testimonials data so each card surfaces a concrete client
  outcome (e.g. "3× faster loan processing", "+42% organic traffic")
  next to the quote.
- Render a 56–64px rounded avatar with lazy-loaded `<img>` (width/height
  set to prevent CLS) and a brand-tinted metric badge in the card
  header. Initials sit behind the image as an automatic fallback if
  the avatar 404s or fails to decode.
- Ship 3 neutral SVG initial-avatars under public/images/testimonials/
  (ajay-pruthi, dhirendra-singh, dilip-raj) as placeholders until real
  headshots are licensed — flagged in the data-array comment so future
  edits know to swap in JPG/WebP at the same path.
- Tighten responsive sizing: card padding scales 8→14, quote text
  scales 20→30, avatar 56→64, and the star+metric row now wraps on
  narrow viewports so the layout reads cleanly at 360/768/1280.
2026-06-17 13:08:38 +05:30
WorkRoot AgentandClaude Opus 4.6 dfd7e5685d Update all pages with accurate company data and add 5th blog post
Deploy to Production / Build & Verify (push) Failing after 5m44s
E2E Test Suite / Form Interaction Tests (push) Has been skipped
E2E Test Suite / Destructive & Chaos Tests (push) Has been skipped
E2E Test Suite / Cross-Browser Regression (chromium) (push) Has been skipped
E2E Test Suite / Cross-Browser Regression (firefox) (push) Has been skipped
E2E Test Suite / Cross-Browser Regression (webkit) (push) Has been skipped
E2E Test Suite / Mobile Device Tests (push) Has been skipped
E2E Test Suite / Security Header Tests (push) Has been skipped
Ping Search Engines / Notify Search Engines (push) Successful in 7s
Deploy to Production / Pre-Deploy Tests (push) Has been skipped
Deploy to Production / Deploy to Railway (push) Has been skipped
Deploy to Production / Deploy to Render (push) Has been skipped
Deploy to Production / Deploy to VPS (PM2) (push) Has been skipped
Deploy to Production / Deploy to Fly.io (push) Has been skipped
Deploy to Production / Post-Deploy Verification (push) Has been skipped
Deploy to Production / Notify on Failure (push) Successful in 2s
E2E Test Suite / Smoke Tests (P0) (push) Failing after 9m14s
E2E Test Suite / Critical User Journeys (push) Has been skipped
E2E Test Suite / API Integration Tests (push) Has been skipped
E2E Test Suite / Test Report Summary (push) Failing after 4s
Uptime Monitor / Health & Response Time (push) Successful in 3s
Uptime Monitor / SSL Certificate (push) Successful in 2s
Uptime Monitor / Send Alerts (push) Has been skipped
Uptime Monitor / Record Uptime Success (push) Successful in 1s
- Fix contact page trust stats (20+ projects, 100% satisfaction, 3+ years)
- Fix portfolio meta description (20+ projects, not 100+)
- Fix services page stats (20+ projects, 100% satisfaction, 6 services)
- Update BaseLayout keywords to match actual tech stack (remove Flutter, add Astro/Golang/Expo)
- Update aggregate rating reviewCount to realistic 20 (was inflated 127)
- Add 5th blog post: Building Scalable ERP Systems
- Replace placeholder SVG blog images with real Unsplash JPEG photos
- Add dedicated image for government IT systems blog post

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-12 20:26:01 +05:30
Clintchiz d402256547 First Init
Deploy to Production / Build & Verify (push) Failing after 5m56s
Ping Search Engines / Notify Search Engines (push) Successful in 2s
Deploy to Production / Pre-Deploy Tests (push) Has been skipped
Deploy to Production / Deploy to Railway (push) Has been skipped
Deploy to Production / Deploy to Render (push) Has been skipped
Deploy to Production / Deploy to VPS (PM2) (push) Has been skipped
Deploy to Production / Deploy to Fly.io (push) Has been skipped
Deploy to Production / Post-Deploy Verification (push) Has been skipped
Deploy to Production / Notify on Failure (push) Successful in 2s
E2E Test Suite / Critical User Journeys (push) Has been skipped
E2E Test Suite / API Integration Tests (push) Has been skipped
E2E Test Suite / Smoke Tests (P0) (push) Failing after 11m26s
E2E Test Suite / Form Interaction Tests (push) Failing after 11m42s
E2E Test Suite / Destructive & Chaos Tests (push) Failing after 12m2s
E2E Test Suite / Cross-Browser Regression (chromium) (push) Failing after 16m14s
E2E Test Suite / Cross-Browser Regression (webkit) (push) Failing after 17m45s
E2E Test Suite / Cross-Browser Regression (firefox) (push) Failing after 25m23s
E2E Test Suite / Security Header Tests (push) Failing after 7m55s
E2E Test Suite / Test Report Summary (push) Failing after 20s
E2E Test Suite / Mobile Device Tests (push) Failing after 2h49m9s
Uptime Monitor / Health & Response Time (push) Failing after 2s
Uptime Monitor / SSL Certificate (push) Successful in 2s
Uptime Monitor / Send Alerts (push) Failing after 3s
Uptime Monitor / Record Uptime Success (push) Has been skipped
2026-03-21 16:46:46 +05:30